Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13671384

- Product Categories
- Friendly Links
Information Name: | Henan providers Qiugao Jiang non-shrink grout Quotes |
Published: | 2015-03-20 |
Validity: | 360 |
Specifications: | 50 / kg |
Quantity: | 1000.00 |
Price Description: | |
Detailed Product Description: | Wuhan Tate kinds of products, one of the top ten brands Building Materials Technology Co., Ltd. specializes in producing grout National Direct Price: Universal Rugged - CGM-1 1300 yuan / ton pisolite rugged - CGM-2 1300 yuan / ton superfine Rugged - CGM -31 600 yuan / ton early strength Rugged - CGM-4 2000 yuan / ton super repair type - CGM-5 2500 yuan / ton to special cement as a binder, selected high-strength materials as aggregate, combined with high flow state, micro-expansion, anti-segregation and other substances from the preparation. The product has with reliable quality, reduce costs and shorten the duration and ease of use. Fundamentally change the base of the forces on the device, so that uniform load to bear all the equipment to meet all kinds of machinery, electrical equipment (heavy equipment, high-precision grinding) installation requirements, is not ideal grout pad installation times. ◎ Product features: 1. High strength, early strength: 1-3 days compressive strength of up 30-50Mpa more. 2. Gravity high: to fill all voids, secondary grouting equipment to meet the requirements. 3. Micro-expansion: to ensure close contact between the device and the base, the second non-shrink grout after. 4. Durability: After hundreds of times fatigue test, 50 freeze-thaw cycle experiments no significant changes in intensity. 30 days immersed in the oil intensity has improved significantly. 5. Winter construction can: -10C temperatures allow for outdoor construction. ◎ Uses: 1. Suitable for machine base, foundation grouting anchor bolts and other equipment and steel (rail, steel, steel columns, etc.) and the secondary grout fixed connection. 2. Reverse engineering can be embedded in a solid construction joints play subways, tunnels, underground and so on. 3. Reinforcing the building beams, plates, columns, foundation, floor and road repair and reinforcement. 4. Anchor and anchor bolts and steel structure can be reinforcing. ◎ Construction Technology: 1. Cleaning equipment based on the basis of surface treatment, without gravel, laitance, dirt, grease and mold release agents and other debris. Grouting before 24h, basic equipment should be fully wet the surface. Before filling 1h, should suck water. 2. Filling way to determine the actual situation of equipment base, select the appropriate grout way, can be "self-respect law grout" high filling funnel law "or" pressure grouting method "grouting to ensure that the slurry can be fully filled every corner. 3 . formwork grout according to the determined way and grouting Figure branch set template, locate the base level should be higher on the device surface at least 50mm, the template must support set tight, secure, prevent loosening, leakage of plasma. 4. Mixing grout 12% -14% of the amount of water weight grout mixing with water, the water temperature is preferably in the 5 ~ 40 ℃ with mechanical stirring time is generally 1 to 2 minutes;. the use of artificial agitation, advised adding water 2/3 stirring for 2 minutes, then add the remaining water and continue stirring until evenly 5. Filling (1). slurry should be poured into the side, until the other side of the overflows, in order to facilitate the discharge of air equipment base and between the concrete foundation so filling full, not grouting simultaneously from four sides. (2) In the grouting process should not be vibrated, if necessary, can pull the diversion of bamboo strips, etc. (3) Until a release before the grouting process Avoid filling layer subjected to vibration and impact, to avoid damage to the hard grout layer outstanding. After 6, conservation (1) filling is completed within 30 minutes, immediately curing compound or covered by plastic film and stamped with rockwool and other conservation or immediately after the final setting grout layer watering moisture conservation. (2) When the winter construction, conservation measures should be consistent with existing "reinforced concrete construction acceptance norms" (GB50204) the relevant provisions. (3) under different temperature conditions Curing time and form removal schedule ◎ Specifications: ◎ Dosage: Dosage Calculation reference to 2.28-2.4 tonnes / cubic meter as the basis to calculate the actual amount used bolt ◎ form:. ◎ Packing and storage: 1, grout for 50kg bags, stored in a dry place and prevent direct sunlight. 2, the shelf life of three months beyond the shelf life should only be used after re-examination qualified. |
Admin>>>
You are the 5319 visitor
Copyright © GuangDong ICP No. 10089450, Saman Building Materials Co., Ltd., Wuhan All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 5319 visitor
Copyright © GuangDong ICP No. 10089450, Saman Building Materials Co., Ltd., Wuhan All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility