Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13671384

- Product Categories
- Friendly Links
Information Name: | Zhengzhou high-strength non-shrink grout secondary manufacturers |
Published: | 2015-03-20 |
Validity: | 360 |
Specifications: | 50 / kg |
Quantity: | 10000.00 |
Price Description: | |
Detailed Product Description: | Wuhan Thai goods grout dry fast, good liquidity, micro-expansion, not contraction, not empty bone to meet the installation requirements of various machinery, electrical equipment, is no ideal filling material base mounting era. Sales price: 1200 yuan / ton (CGM-1 Universal and CGM-2 pisolite type) 1400 yuan / ton (CGM-3 superfine) 2000 yuan / ton (CGM-4 high early strength) 2800 yuan / ton (CGM-340A Ultra-flow type) can be adjusted according to your special needs, price negotiable △ scope mainly used for: fixed anchor bolts, runway repairs, nuclear power equipment, road and bridge engineering reinforcement, machine base, steel Huai mouth and foundation, the basis of secondary grouting equipment, plant buried reinforced concrete structure reinforcement and renovation of old concrete cracks governance structure, mechanical and electrical equipment installation, rail and installation of steel structures, static piling engineering seal pile wall thickening and structural repair leaking water seepage, the collapse of various infrastructure projects and a variety of repair grouting works. △ description: A special cement as a binder, selected high-strength materials as aggregate, combined with high flow, micro-expansion, anti-segregation and other substances from the preparation. # # Product Keywords gravity has good, fast and hard, early strength, high strength, non-shrink, micro-expansion; non-toxic, harmless, non-aging, pollution of water quality and the surrounding environment, and good self-dense, rust, etc. . With reliable quality, reduce costs and shorten the duration and ease of use in the construction areas. Fundamentally change the base of the forces on the device, so that uniform load to bear all the equipment to meet all kinds of machinery, electrical equipment (heavy equipment, high-precision grinding) installation requirements, is not ideal grout pad installation times. △ characteristics: high strength early strength after 1-3 days pouring over the strength of up to 30Mpa, shorten the construction period. Artesian state scene just add water and stir, equipment foundations poured directly, mortar gravity, vibration-free construction, to ensure that no vibration, grouting distances. Micro-expansion of long-term use of non-shrink casting body, to ensure that equipment and infrastructure in close contact, no contraction between the foundation and the foundation, and appropriate expansion stress to ensure long-term safe operation of equipment. Anti-oil seepage in the oil for 30 days increased by more than 10 percent of its strength, molded, dense, impervious, environmental adaptation base oil. Durability 2 million times fatigue test, 50 freeze-thaw test environment was no significant change. Good weather -40 ℃ ~ 600 ℃ long-term safe use of low alkali content of alkali corrosion strict control of raw materials for the alkali - aggregate reaction inhibit the requirements of the project. △ use: 1. Cleaning equipment based on the basis of surface treatment, without gravel, laitance, dirt, grease and mold release agents and other debris. Grouting before 24h, basic equipment should be fully wet the surface. Before filling 1h, should suck water. 2. Filling way to determine the actual situation of equipment base, select the appropriate grout way, because of CGM has good flow properties, under normal circumstances, with "filling weight method" can be, since the template is about to paste directly poured into the mouth completely rely on self-leveling slurry weight and fill the entire space perfusion; if perfusion area of ??the large, complex or spatial structure, especially small and very far away, we can use "high filling funnel method" or "pressure grouting method" grouting to to ensure that the slurry can fully fill every corner. 3. Formwork grout according to the determined way and grouting Figure branch set template, locate the base level should be higher on the device surface at least 50mm, the template must support set tight, secure, prevent loosening, leakage of plasma. 4. Stir grout product certification by the ratio of water to determine the recommended amount of water, mixing water should be used in drinking water, the water temperature to 5 ~ 40 ℃ is appropriate, can be mechanical or manual mixing. When using mechanical stirring, stirring time is generally 1 to 2 minutes. Artificial agitation, advised adding 2/3 of water for 2 minutes, then add the remaining water and continue stirring until evenly, add water standard consistency of 12% -14%. 5. Construction grout grout should meet the following requirements: (1) the slurry should be poured into the side, until the other side of the spill so far, in order to facilitate the discharge of air equipment between base and concrete foundation, so filling full, not from the four sides while grouting. (2) After filling begin, you must be continuous, without interruption, and should be as short as possible filling time. (3) should not be vibrated, if necessary, bamboo strips available in the filling process is pulled diversion. (4) Every time the grout layer thickness should not exceed 100mm. (5) a long track-based equipment or grout should be used in the construction segment. Each length 10m appropriate. (6). Grouting process, such as bleeding surface phenomenon, CGM can be a small amount of dry material dispenser, sucking up water. (7) of the grout layer thickness is greater than 1000mm bulky equipment foundation grouting, the total amount available in the mixing ratio of a grout: 1 Add 0.5mm stones, but subject to testing to determine whether it can meet the requirements of irrigation. (8) After the completion of foundation grouting equipment to remove the part should be conducted before the final setting of the grout layer processing. (9) In the grouting process until the front ejection, should avoid filling layer subjected to vibration and impact, to avoid damage to the outstanding hard grout layer. The level of the base template and equipment (10) should be controlled at a distance of about 100mm, in order to facilitate grouting. (11) In case of filling in the running plasma phenomena, should be promptly treated. (12) When the equipment foundation grouting is large, mechanical mixing method should be used to ensure the grouting. After 6, conservation (1) filling is completed within 30 minutes, immediately curing compound or covered by plastic film and stamped with rockwool and other conservation or immediately after the final setting grout layer watering moisture conservation. (2) When the winter construction, conservation measures should be consistent with existing "reinforced concrete construction acceptance norms" (GB50204) the relevant provisions. (3) curing time and form removal schedule △ packaging and storage under different temperature conditions: 1, the product is a plastic bag (plus lining), net weight 50 kg / bag. 2, shall be stored in a dry and ventilated room. 3, the shelf life of six months. |
Admin>>>
You are the 5319 visitor
Copyright © GuangDong ICP No. 10089450, Saman Building Materials Co., Ltd., Wuhan All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 5319 visitor
Copyright © GuangDong ICP No. 10089450, Saman Building Materials Co., Ltd., Wuhan All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility